COMPLETED PROJECTS
Below projects were undertaken directly by elmec or through full involvement by our key personnel:
Construction of Mass Rail Transit (MRT) Project Line 1 Sungai Buloh Kajang (Power Supply & Distribution System)
- 33KV GIS (72 substations)
- 750V DC Traction System & Switchgear (23 Substations)
- Rectifier & Rectifier Transformer
- Track Isolator, Earth Switch, Overvoltage Protection System (OVPD)
- 110V DC/Battery System
Construction of 1000MW Ultra Supercritical Coal Fired Steam Turbine Power Plant Tanjung Bin 4 which consists of Power Block, Balance of Plant & Rest of Plant
- Steam Turbine Generator & Boiler
- Main Generator & Auxiliary Transformer
- Water Treatment Plant/Deminirealized Water Plant
- Fuel Gas Desulfurization (FGD)
- Coal Handling System
- Light Fuel Storage/Station
- Compressor room & Pumping Station
- HV/MV/LV Electrical System
Upgrading of Labuan Airport Project (Joint operation with RMAF)
- Instrument Landing System (ILS) consist of Localizer, Glide Path & Distance Measuring Equipment GP/DME,
- Aircraft Arresting System consist of Cable Arresting System and Net Arresting System (Defense)
- Airfield Ground Lighting System (AGL)




