Completed Projects

COMPLETED PROJECTS

Below projects were undertaken directly by elmec or through full involvement by our key personnel:

Construction of Mass Rail Transit (MRT) Project Line 1 Sungai Buloh Kajang (Power Supply & Distribution System)

  • 33KV GIS (72 substations)
  • 750V DC Traction System & Switchgear (23 Substations)
  • Rectifier & Rectifier Transformer
  • Track Isolator, Earth Switch, Overvoltage Protection System (OVPD)
  • 110V DC/Battery System

Construction of 1000MW Ultra Supercritical Coal Fired Steam Turbine Power Plant Tanjung Bin 4 which consists of Power Block, Balance of Plant & Rest of Plant

  • Steam Turbine Generator & Boiler
  • Main Generator & Auxiliary Transformer
  • Water Treatment Plant/Deminirealized Water Plant
  • Fuel Gas Desulfurization (FGD)
  • Coal Handling System
  • Light Fuel Storage/Station
  • Compressor room & Pumping Station
  • HV/MV/LV Electrical System

Electrified Double Track Project – Ipoh To Padang Besar

  • Relocation of Utilities (Kedah & Perlis)
  • Construction of Depot KTMB Padang Besar
  • Construction of Staff Quarters, Operation Stations, Minor & Major KTMB Stations (Kedah & Perlis)

Upgrading of Labuan Airport Project (Joint operation with RMAF)

  • Instrument Landing System (ILS) consist of Localizer, Glide Path & Distance Measuring Equipment GP/DME,
  • Aircraft Arresting System consist of Cable Arresting System and Net Arresting System (Defense)
  • Airfield Ground Lighting System (AGL)

The Construction and Completion of Boulevard Precinct 3 and Precinct 4, and Boulevard Enhancement of Precinct 2, 3 and 4.

Installation of Signage, MMG, SVMS and CCTV at Boulevard Precinct 2, Precinct 3, and Precinct 4.